Ad

Project complete road dwg

PROJECT COMPLETE ROAD

The third class road connects two points on a rolling topography, (1st point: 1008 m to the 2nd point: 1090 m) the project consists of the layout of routes - the floor (with item box curves sonbreanchos circulars) and profile (slope, vertical curves, terrain elevation height flush height of cut filler) final shaft road - the respective cross sections of the first kilometer (cut and fill areas) and their mass diagram . the entire project is based on the peruvian standards for road design (dg - 2001).

Cargando social...
Cargando report...
4.6kVistas
Cargando tags...

Trabajos relacionados