Ad

Plan of demolition of irrigation channels dwg

Plan of demolition of irrigation channels

The demolition work of the first section is of a trapezoidal section concrete channel with a length of 5.15ml. in this section a catchment post will be constructed to be derived with a lateral intake; with dimensions shown in the plane 1 / 1-1 / 1-02 / 33. the demolition work of the second section is of an energy dissipating post, of a rectangular section with a length of 8.15ml. in this section, a new dissipation post will be built with dimensions shown in the drawings 1 / 1-1 / 1-10 / 33

Cargando social...
Cargando report...
4.1kVistas
Cargando tags...

Trabajos relacionados