Rehabilitation project; recovery and automation deep wells patía valley dwg
The project deals with recovery and automation with real-time operation of deep wells for the development of agricultural and subsistence activities for the rural community of the valley of patía colombia. the project is designed under mitigation determinants; adaptation and resilience to the threat of risk of? drought? that occurs in the municipality of patía affecting the population; for the insufficiency in the availability of water to meet their needs. existing deep wells will be enabled with obsolete operation equipment which will be substituted with sustainable alternative technology, including its distribution and storage network, up to the influence grounds of each well; with the objective of distributing the water to the users assuming a volume determined by the conditions of the average maximum deposit of 10,000 liters per well per day and an average of 6; 12; 18 and 24 users within a maximum radius of 3 kilometers around each specific well; in addition to the previous ones, establish a remote monitoring and control system for the aquifer and aquifer operation; in real time.
Confirma el mail en Facebook e intenta nuevamente.
Confirma el mail en Google e intenta nuevamente.
_ACCOUNT_INACTIVE_ [email protected].